Whole-house jobs across Sydney
Structure, floors and finishes from whole-house renovations — mid-way through and at handover.









Renovating more than one room?
Send photos and a room-by-room list. You'll get one scope, one program and one price.
Holding a long renovation together
Sequence, trade booking and one accountable contact hold a three-to-six-month renovation together.
One scope, one program
Every room, trade and stage in one document, in a sensible order, with dependencies visible before we start.
Trades booked to the sequence
Electrician after framing, waterproofer before tiler, painter after cornice. Booked in order, and rebooked by us when something moves.
One person accountable
When a decision is needed or something goes wrong, there's one number to call and one person answerable.
Extensions and additions
Adding a room or extending the footprint runs through the same process: scoped, engineered where it touches structure, and sequenced with everything else.

Long jobs fail in the gaps, not the trades
On a whole-house renovation the trades are rarely the problem. What goes wrong is the space between them.
The classic failure is a trade arriving to find the one before hasn't finished. The tiler leaves and comes back in eleven days, and the painter slips behind the floor sander, who's now behind the kitchen joiner. One missed dependency costs a fortnight.
The second is late decisions. Tile and tapware for a bathroom renovation or a power point position: a choice made in week two costs nothing, and the same choice in week nine costs a return visit.
The third is what the house is hiding: unpermitted work, rot at the base of a stud wall, old wiring. We open it up, show you and price it properly.
Holding the program and rebooking around slippage is the real service on a job this size, and why we work as a licensed builder in Marrickville. The same applies when a granny flat build runs alongside the main house.
The parts of a whole-house renovation that get certified
On a whole-house job, compliance is spread across months and trades. This is what gets signed off, and what you finish holding. Sydney Property Works Pty Ltd holds NSW Contractor Licence 492200C.
Built to the NCC edition in force
Jobs quoted now follow NCC 2022, which NSW applies until NCC 2025 starts on 1 May 2027. On a whole-house job that covers structure, fire separation, ventilation, glazing and energy, not just finishes.
Structural work engineered, not estimated
Removing or altering a load-bearing wall, or changing how the roof or upper floor is carried, is engineered and certified. If a builder offers to take out a wall because they've done it before, get a second opinion.
Every wet area to AS 3740:2021
Every bathroom, ensuite and laundry is waterproofed to the current Australian Standard, with its own certificate. Three wet areas should mean three certificates.
The handover pack
Waterproofing, electrical and plumbing certificates, engineering where structure was touched, and photos of what went in before it was covered. Home warranty cover comes first: on jobs over $20,000 we send you the HBCF certificate before we take a deposit or start work.
Six stages, and the order matters
On a long renovation the sequence is the product. Get it wrong and twelve weeks becomes twenty.
Walk the house
Room by room: what you want changed, what stays, and what the building allows.
Scope, program and quote
Full scope in writing with a stage-by-stage program, showing when each decision is needed.
Strip out and structure
Demolition and structural work, making the building sound before anything new goes in.
Services rough-in
Plumbing, electrical and gas set in their new positions while the walls are open.
Linings and wet areas
Insulation, plasterboard, waterproofing and tiling. The rooms start to look like rooms again.
Fit-out and handover
Joinery, fixtures, painting and flooring, then a defects walk-through together before handover.
Inside a whole-house renovation
A full renovation is really several of these, run as one job.
What owners ask before committing to a full renovation
What a full house renovation costs in Sydney and how long it takes, whether you can live in the house during the work, and how variations, structural surprises and progress payments are handled.
How much does a full house renovation cost in Sydney?
Anyone quoting a figure before seeing the house is guessing. The range depends on the size of the house, how much structure changes, whether wet areas move, and what the building is hiding. What we do is make our quote comparable: scope, stages, allowances and licensed trades are itemised, so you can hold it beside two others. The gap between quotes is almost always something one of them left out.
How long does a full house renovation take?
Most run three to six months on site. The sequence matters more than the size — one missed dependency between two trades is what turns a twelve-week job into a twenty-week one, because the trade that could not start has to wait for its next gap. You get the realistic program with the quote, stage by stage, including which stages could move and why. Approvals and long-lead items like cabinetry shift the dates more than the building work does.
Can we stay in the house during the work?
Sometimes, and it changes the program. Staging a job so one half of the house stays liveable is slower and costs more than working through an empty house, because trades cannot run in parallel and everything gets sheeted off. We will price both ways if you want to compare.
How do you handle changes once we have started?
In writing, before the work happens. A variation gets scoped and priced and you approve it. The alternative — verbal agreements on site that surface on the final invoice — is how renovation relationships break down.
What happens if you find something structural?
We stop, show you, and price it as a variation. Rot, termite damage, undersized bearers and previous unpermitted work are all common in older Sydney homes. Finding them is normal; hiding them is not.
Do we need approvals for a whole-house renovation?
It depends on what you are changing. Internal work that does not touch structure often does not need approval. Moving or removing load-bearing walls, altering the roofline, changing the footprint, or anything on a heritage-listed property generally does.
How do payments work on a longer job?
Progress payments tied to completed stages, set out in the contract before work starts. You are paying for work that has been done, not work that is planned.
Who runs the site day to day over a job this long?
On a whole-house job the coordination is the product, so it sits with one person for the duration rather than passing between trades as each stage starts. Structural and building work is signed off by a licensed builder as part of that coordination; plumbing, electrical and waterproofing go to the relevant licence holder. What you should not be doing on a three to six month job is chasing tradespeople yourself — that is the thing you are paying a head contractor to absorb.
What warranty do I get on a whole-house renovation?
Statutory warranties under the NSW Home Building Act apply automatically to the work and cannot be contracted out of — six years from completion for a major defect, two years for anything else, with an extra six months if something surfaces in the final six months of that period. It is on top of the workmanship itself, and it is why the handover pack matters — it is the record you point to if you ever need to make a claim.
Tell us about the house
Rough age of the property, which rooms are in scope, and whether you plan to live in it during the work. Those three answers shape the program more than anything else.
- Visit us5/49 Carrington Rd, Marrickville NSW 2204, Australia
- Call us0404 767 374
- Email usinfo@sydneypropertyworks.com.au
- Opening hoursMon – Fri: 8:00 AM – 5:00 PM, Sat: 8:00 AM – 2:00 PM, Sun: Closed
Walk us through the house
The best first step on a whole-house job is a walk-through together, room by room. We will tell you what is straightforward, what is not, and roughly where the money goes.