Kitchen renovations

A kitchen built around how you cook

Bench space where you prep, power where you use it, and drawers deep enough for what you own. Layout decisions get made before the cabinetry is ordered, not after.

492200CNSW contractor licence
HBCFWarranty over $20k
AS 3740Certified waterproofing
14 yrsSince 2012
5.0 ★10 Google reviews

Planning a kitchen like these?

Send photos or a floor plan and your appliance list. You'll get an itemised scope and price back.

What the job involves

Where a kitchen is won or lost

Layout, services and appliance clearances decide a kitchen long before anyone picks a benchtop.

Layout before cabinetry

Fridge door swing, bin-to-sink distance, room for two behind the oven. Settled on paper before anything is ordered.

Cabinetry and benchtops

Carcasses scribed to out-of-square walls, doors aligned along the run, and benchtop joins placed where you won't notice them.

Services moved properly

Plumbing, gas and power relocated and certified for the new layout, not stretched with an adaptor.

Appliances that fit

Cavities checked against the actual model before cutting, including door clearance and ventilation gaps.

What usually goes wrong

The kitchen mistakes that cost the most to undo

The expensive errors in a kitchen are rarely the finishes. They're decisions about position, made too late.

The most common is ordering cabinetry before the services are confirmed. Move the sink and the waste moves too, and if that run crosses a joist, the floor comes up.

The second is the appliance list. Cavities are cut to a model, not a category, so a late oven swap can mean a new door, a new panel and a four-week wait.

The third is bench height. Raising a run 20mm costs nothing at design stage and can't be done once the stone is templated.

We settle all three before anything is ordered. On a full house renovation, or alongside a bathroom renovation, that order decides everything that follows.

Standards and materials

What goes in, and what it has to comply with

Cabinetry is the part you see. This is what's underneath it, and what keeps the kitchen square, dry and safe in ten years.

Licensed Kitchen, Bathroom and Laundry Renovator

Kitchen renovation is its own licence class, held on NSW Contractor Licence 492200C. You can search it on the Fair Trading public register.

Home warranty insurance, included in the price

On residential jobs over $20,000, Home Building Compensation Fund cover is built into your quote. Once you approve it, we arrange the policy and send you the certificate before we take a deposit or start work. If we couldn't finish the job or fix a defect, you can claim up to $340,000: six years for major defects, two years for everything else.

Built to the NCC edition in force

Jobs quoted now are built to NCC 2022, which NSW applies until NCC 2025 starts on 1 May 2027. Removing a wall to open up the kitchen is engineered and certified, not judged by eye.

Moisture-resistant board where water goes

Under the sink, behind the dishwasher and along the splashback, we use moisture-resistant board and seal the cut edges. Standard particleboard swells and never recovers.

How a kitchen runs

From measure to fit-off

Cabinetry has a lead time, so the measure and appliance list get settled early.

1

Measure and layout

We measure, talk through how you use the space, and settle the layout and appliance list together.

2

Written scope and quote

Cabinetry, benchtop, appliances, services and finishes priced, with allowances clearly marked.

3

Cabinetry ordered

Final check measure goes to the cabinetmaker. After this, layout changes get expensive.

4

Strip out and services

Old kitchen out, plumbing, gas and electrical moved to the new positions, walls and floor made good.

5

Install and fit-off

Cabinetry installed and levelled, benchtop fitted, appliances connected and the room finished.

Kitchen questions

Asked before every kitchen we quote

How a kitchen renovation is priced in Sydney, how long you will be without a kitchen, and which benchtop materials are still available since the engineered stone ban.

What does a kitchen renovation cost in Sydney?

There's no rate card, because cabinetry and benchtop choices move the price far more than labour does. What we do is make the quote comparable: cabinetry, benchtop, appliances, services and licensed trades are listed separately, so you can see what each decision costs and change your mind before anything is ordered. Next to two other quotes, the differences are usually in what's been left out.

How long will we be without a kitchen?

Usually three to five weeks from strip-out, depending on cabinetry lead time and the benchtop material. The gap between install and benchtop templating is the part people underestimate — the top is measured off the installed cabinetry, then cut, which adds one to two weeks on its own.

Can we keep the plumbing and gas where they are?

If the sink and cooktop stay put, yes, and it takes real cost out of the job. Moving them is straightforward in a single-storey home over a subfloor and considerably harder on a concrete slab or an upper storey.

Do you do the cabinetry in-house or subcontract it?

Cabinetry is made by a cabinetmaker to our measure and installed by us. That means one point of accountability for the fit — if a door does not sit right, it is our problem to solve, not a conversation between two suppliers.

Can we still get an engineered stone benchtop?

No, and this is the question we now get asked most. Since 1 July 2024 the manufacture, supply, processing and installation of engineered stone benchtops, panels and slabs has been prohibited nationally, because of the silicosis risk to the people who fabricate it. Any contractor still offering it for a new kitchen is either uninformed or willing to break the law, and neither is who you want cutting into your house.

So which benchtop material should we choose?

Natural stone (granite, marble, limestone) is the closest like-for-like and isn't affected by the engineered stone ban. Porcelain is the popular replacement: hard, heat and stain resistant, and made in stone-look slabs. Laminate is far cheaper and better than its reputation, and suits rentals and laundries. Timber needs re-oiling, and stainless steel is excellent if you like the look. We'll match the material to how you use the kitchen.

Can you work around us living in the house?

Yes, and most of our kitchen jobs are done that way. We will talk through a temporary setup — usually the fridge relocated with a kettle and microwave nearby — and keep the dust contained to the work zone.

What if the walls are out of square?

They will be. Almost every older Sydney home has walls out by 10mm or more across a run. Cabinetry gets scribed to fit rather than forced, which is a normal part of the install and not an extra.

Are you licensed and insured for kitchen renovations?

Yes. Sydney Property Works Pty Ltd holds NSW Contractor Licence 492200C for Kitchen, Bathroom and Laundry Renovation, current to 10 March 2029 with a clean record on the Fair Trading register. We carry $10 million public liability and workers compensation through icare NSW, and send you a certificate of currency before work starts. Kitchens over $20,000 also carry Home Building Compensation Fund cover, with the certificate sent to you before we take a deposit or start work.

What warranty do I get on a kitchen renovation?

Statutory warranties under the NSW Home Building Act apply automatically to kitchen renovation work and cannot be contracted out of — six years from completion for a major defect, two years for anything else, with an extra six months to raise anything that surfaces in the final six months of that period. Call the same number you have been calling; defects get fixed, not negotiated.

Organisations that vet their trades before hiring them

Send us the kitchen

Photos, a rough floor plan and your appliance list are enough to start. Tell us what does not work about the current layout — that is usually the most useful thing you can say.

  • Visit us5/49 Carrington Rd, Marrickville NSW 2204, Australia
  • Opening hoursMon – Fri: 8:00 AM – 5:00 PM, Sat: 8:00 AM – 2:00 PM, Sun: Closed

Quote Request

Your Details

Kitchen renovations Sydney

Start with the layout, not the finishes

Book a measure and we will work through how the room needs to function before anything gets specified. The quote follows from that.

ZMade with Zarla