Licensed and insured14 years serving SydneyDetailed written quotesResidential renovation specialists★ 5.0 on Google (10 reviews)
NDIS home modifications

NDIS home modifications, built to the OT report

Accessible bathrooms, ramps, grab rails, widened doorways and level-entry access across Sydney, for self-managed and plan-managed participants. NDIS Worker Screening cleared, and we build to the occupational therapist's specification.

492200CNSW contractor licence
NDISWorker Screening
AS 1428Access dimensions
14 yrsSince 2012
5.0 ★10 Google reviews

Ready to price a modification?

Send the OT report and a few photos of the space. We'll quote against the specification, line by line.

Tiled shower being measured against the specified dimensions
What usually goes wrong

A rail in the wrong place is worse than no rail

Home modifications fail differently from ordinary renovations. A grab rail fixed into tile instead of structural backing holds until someone puts their weight on it. A level-entry shower without the right fall sends water across the floor it was meant to make safer. A ramp at the wrong gradient is unusable.

That's why we build to the occupational therapist's specification, not around it. Those dimensions come from how one person moves, transfers and reaches.

If the building can't deliver what's specified, we resolve it with the OT in writing before work starts. Where the modification is a new self-contained dwelling, the same specification governs the granny flat build.

Standards and evidence

What a home modification is measured against

A modification is checked by the OT who specified it and by whoever reviews the plan. Both look for the same things. Sydney Property Works Pty Ltd holds NSW Contractor Licence 492200C.

NDIS Worker Screening Check

Anyone attending your home holds a current NDIS Worker Screening Check, which you or your support coordinator can verify on the national database before we start.

The OT specification is the standard

Dimensions, heights and rail positions come from the OT's assessment and aren't adjusted on site. If the building can't deliver them, we resolve it with the OT in writing first.

Access work to the AS 1428 dimensions

Ramp gradients, landings, door widths, circulation space and handrail heights follow the access standards in the OT report. A wrong gradient makes a ramp unusable.

Rails fixed to structure, not to lining

Grab rails are load-bearing. They're fixed into noggings or structural backing, never into tile, adhesive or plasterboard anchors.

Paperwork first, then build

How a home modification runs

Modifications move at the pace of the paperwork, so the order matters.

1

The OT assessment comes first

The occupational therapist assesses what's needed and writes the specification. Your support coordinator or plan manager can refer you to one.

2

Site measure and build quote

We measure against the report and price the work. If the building won't allow what's drawn, we raise it with the OT before quoting.

3

Quote goes into the plan

You submit our itemised quote with the OT report through your plan manager or self-managed process. Approval sits with the NDIA.

4

Scheduling around the household

We agree staging upfront, keep facilities usable where we can, and give you a realistic duration.

5

Build, certification and sign-off

Licensed trades for wet areas, plumbing and electrical, with certificates and fixing details recorded as we go.

6

Handover with evidence

Photos, certificates and a completion record matched to the specification, ready if the work is ever reviewed.

NDIS questions

Home modifications, answered

Whether you need an OT report first, whether we can work with your plan type, the difference between minor and complex modifications, and how a quote goes into your plan.

Are you a registered NDIS provider?

Not yet. Our registration is in progress. If you're self-managed or plan-managed, you can use an unregistered provider and we can quote your job now. If your plan is agency-managed by the NDIA, you'll need a registered provider, so we're not the right fit until our registration comes through. We'll confirm which applies on the first call.

Who will be in my home?

Anyone attending a modification job holds a current NDIS Worker Screening Check. It is a national clearance, it is recorded on the NDIS Worker Screening Database, and you or your support coordinator are welcome to verify it before we start. For work in someone's home, that check matters more than most of the other credentials on this site.

Do I need an occupational therapist report before you can quote?

For anything the NDIA will fund, yes. The OT assessment establishes what is needed and specifies it; our quote prices that specification. We can look at a job and give you a rough sense of scale beforehand, but a build quote without a report is not something a plan reviewer can act on. If you are paying privately, no report is required.

What is the difference between a minor and a complex home modification?

Broadly, minor modifications are non-structural — grab rails, threshold ramps, hardware changes, simple access work. Complex modifications involve structural change, wet areas, or work that needs certification and a builder. The distinction affects how it is assessed and funded, so if a job looks like it will cross the line we tell you at quote stage rather than partway through.

Do you work with plan-managed and self-managed participants?

Yes, and under the current rules those are the two plan types that can choose an unregistered provider. We invoice in the format your plan manager needs and are happy to deal directly with them, with your support coordinator, or with the OT.

How long does approval take?

That sits with the NDIA and it varies — complex modifications commonly take longer than people expect. What we can control is our end: a quote that is itemised, matched to the report, and does not come back with questions attached. We will hold a quote for a reasonable period while approval is pending, and tell you if material costs have shifted enough to matter.

Can you work in a rental or a strata property?

Yes, with the right consent. Rentals need the owner's written agreement, and strata properties usually need approval where the work touches common property or the building's waterproofing. We can tell you what will need consent before you start the conversation, so you are not asking twice.

Will the house be liveable during the work?

We plan for it. Bathroom modifications are the hardest, because there is often no second bathroom, so we stage the work to minimise the days it is out of action and agree that plan with you before we start. If a period without facilities is unavoidable, you will know the dates up front.

What do I get at the end?

Photographs of the completed work, waterproofing and any other certificates, fixing details for load-bearing items, and a completion record set against the OT specification. If the modification is ever queried, that is the evidence you will be asked for.

Is the work insured if something happens to the builder?

On modification work over $20,000, such as a bathroom conversion, the job carries Home Building Compensation Fund cover, and we send you the certificate before we take a deposit or start work. If we couldn't finish or fix a defect, you can claim up to $340,000: six years for major defects, two years for everything else. Smaller jobs sit under the threshold and aren't covered by the scheme.

What warranty applies to a home modification?

The same statutory warranties under the NSW Home Building Act apply to modification work as to any other residential building job — six years from completion for a major defect, two years for anything else. For anything load-bearing, like a fixed rail or a ramp structure, that is on top of the fixing being certified at handover.

Organisations that vet their trades before hiring them

Send through the OT report

If you have an occupational therapist's report, attach it or tell us and we will arrange to receive it. If you are earlier than that, say so — we can tell you what the process looks like from here.

  • Visit us5/49 Carrington Rd, Marrickville NSW 2204, Australia
  • Opening hoursMon – Fri: 8:00 AM – 5:00 PM, Sat: 8:00 AM – 2:00 PM, Sun: Closed

Quote Request

Your Details

NDIS home modifications Sydney

Have an OT report? Send it through for a quote.

We quote directly against the specification, and we are happy to talk to your occupational therapist, support coordinator or plan manager. Call 0404 767 374 or send the report through.

ZMade with Zarla